Greentek Resources supplies washed concrete sand and construction aggregates from our Rogers Road pit in West Monroe, Louisiana. Built to serve ready-mix concrete producers first, our operation delivers consistent gradation, dependable weekly volumes, and documented quality control to support uninterrupted batching operations.
Commercial production begins March 1.
Aggregate supply plays a critical role in Louisiana’s construction and infrastructure economy, where concrete production depends on reliable access to locally sourced sand and aggregate. Because transportation distance directly impacts cost and supply reliability, ready-mix producers depend on dependable, nearby material sources.
Greentek Resources was developed to support this need with a local, scalable aggregate operation serving the West Monroe region.

• Produced to meet ASTM C33 gradation requirements
• Suitable for ready-mix concrete, precast, and structural applications
• Clean, washed material with controlled fines and low deleterious content
• Testing and certification available for DOT and project submittals
Applicable Standards: ASTM C33 AASHTO M 6 / AASHTO M 80 (as applicable)

• Uniformly graded sand for batching, trench backfill, drainage, and roadway applications
• Consistent material suitable for municipal and infrastructure projects

• Straight-run or lightly processed sand for embankments, pads, and bulk fill
• Gravel and oversize aggregate recovered in select zones
• Availability subject to deposit variability and production sequencing
Greentek Resources production is planned using sustained weekly output rather than peak feed capacity.
• Base commercial supply: approximately 9,000 tons per week
• Expanded supply (extended hours / surge demand): up to 18,000 tons per week
• Capacity may be allocated across multiple products depending on project requirements

• Material sourced from bore-tested subsurface deposits
• Washing and screening remove excess fines and organics
• Products stockpiled separately to preserve gradation integrity
• Gradation reports and compliance documentation available for DOT, engineer, and owner review
• First commercial availability: March 1
• Spot loads, project allocations, and contract supply available
• Capacity scalable to support phased construction schedules and peak demand periods
